thomisonariel306 thomisonariel306
  • 06-11-2017
  • Health
contestada

Asking potential dating partners for a date is most likely to be reinforced on a ________ schedule.

Respuesta :

andriansp andriansp
  • 20-11-2017
the answer to this question is variable-ratio schedule
variable-ratio schedule refers to a schedule of reinforcement in which the response is being reinforced. after an unperdictable amount of response is being made.
The purpose of this type of scheduling is to create a high rate of responses.

Answer Link

Otras preguntas

i need a little help with tpcastt for the poem identity by julio noboa
how and why was he able to get help from some of the indigenous peoples?
hi what is full form of ugst​
Write 6 1/6 as an improper fraction
1 2 4 6 7 10 10 14 ?​
Put the following statements in order__Hagrid gives dudley a pig tail__Harry and the Dursleys awaken to a loud knocking at the door__Hagrid tells Harry that his
The table below shows the number of times the arrow stops on each colour COLOUR blue red pink green yellow Frenquncy 45. 37. 52. 94. 72 B) the spinner is spun o
Se llevan en las manos A. los guantes B. las botas C. los calcetines D. los pantalones
-1/9 (x-1/9) = 1/5(x-1/9)
There were 32 students in Jaden’s class eating lunch. Then, more students joined Jaden’s class. Now there are 86 total students eating lunch. How many students