paytonrules9724 paytonrules9724
  • 08-06-2017
  • Mathematics
contestada

One crew can seal a parking lot in 8 hours and another in 10 hours. How long will it take to seal the parking lot if the two crews work together?

Respuesta :

bluebruno
bluebruno bluebruno
  • 08-06-2017
i want to say 6 but i am only 70% shure

Answer Link

Otras preguntas

If n = 4, the value of the expression 28 – 12 + vñ : 2 is 0 15 021 O 017
factorize 27a³-b³-1-9ab
Please choose the answer that best completes the blanks of this sentence in the correct order. The name of the organism should be labeled on the _______ of an a
Two bags each contain 2 black balls, 1 white ball, and 1 red ball. One ball is to be selected from each bag. What is the probability of selecting the white ball
In your job as an agent, you receive a monthly salary of $500 plus 3% commission on all of your listings that sell and 2.5% of all of your sales. None of the li
Why is flexibility important in living a healthy and fit life? It improves endurance and muscle strength. It reduces risks related to high cholesterol rates. I
Which statement about agriculture impacts is false? Agroecosystems try to control a certain number of species in a limited area. Fewer pesticides are used w
Differentiate between GDP and GNP in a sentence.
Which part of a story starts the action of the plot?A. the denouementB. the resolutionC. the inciting incident D. the exposition​
How much gift wrap is needed to cover a box measuring 18 inches by 12 inches by 4 inches?