alyssawilmoth1
alyssawilmoth1 alyssawilmoth1
  • 15-09-2022
  • Mathematics
contestada

A construction crew has just built a new road. It took them 8 weeks to build 10.24 kilometers of road. At what rate did they build the road?

Respuesta :

Aswanglol6
Aswanglol6 Aswanglol6
  • 15-09-2022

Answer:

Are you trying to figure out how long the road is?

10.24 km per week, times 4 weeks.

10.24 x 4 = 40.96

Step-by-step explanation:

Answer Link

Otras preguntas

How is Darwin's theory of natural selection different than similar theories of earlier scientists? A No scientist before Darwin had any similar theories. B Da
What was Len Kleinrock attempting to do for the first time in history?​
What is the value of in the equation shown?
Identify the option that correctly completes this sentence. I prefer​ Revlon, because​ __________ a nail polish formula that is​ formaldehyde-free. A. he use
2 A laptop computer is purchased for S4500. Each year, its value is 75% of its value the year before. After how many years will the laptop computer be worth S60
The motor of an RC car does 312 J of work to move the same car 419 m, what is the force the motor exerts?
If 3n+ 2=8 find the value of n.​
Alicia needs to purchase carpet to cover a triangular space. The space has a base length of 10 ft and a height of 6.4 ft. How many square feet of carpet does Al
Can someone help me will mark brainlist
1 Work out the sizes of the unknown angles. a 66° 63 50° 1090