1564145
1564145 1564145
  • 06-05-2022
  • Mathematics
contestada

In the EST graph above, what is the required time to complete task A? ​

In the EST graph above what is the required time to complete task A class=

Respuesta :

sqdancefan
sqdancefan sqdancefan
  • 06-05-2022

Answer:

  5 time units

Step-by-step explanation:

The number on the arrow in this graph is the task completion time.

__

The completion time for Task A is 5 time units.

Ver imagen sqdancefan
Answer Link

Otras preguntas

What effect might a foreign conflict like the one mentioned in the reading have on Americans' support for their new nation and its government?
find the product of (-4+11i)(-5-8i)
Find the mean 7 8 8 9 9 9 10 10 10 10 11
according to kyoriku, what does it mean when the subject matter and the combination are excellent but a good haiku cannot be found
If 7 knicks = 2 knacks and 3 knacks = 4 knocks, how many knicks are equal to 24 knocks?
A random sample of 125 basketball players was asked if they wore high top or low top shoes while playing. The results are shown in the table. High top shoes Low
what are examples of nationalism in ww1
HHHHHEEEEELLLLLPPPP!!!!!!Choose the correct verb form that completes the sentence. Mi mamá __________ los calcetines azules por los calcetines blancos. cambio c
Occurs when the moon moves between the Earth and Sun and blocks the light
Solve 80/100 = 68/n using cross multiplication.