chadwickt0912 chadwickt0912
  • 10-09-2021
  • Mathematics
contestada

a railroad crew can lay 6 miles of track each day. they need to lay 174 miles of trade.

Respuesta :

mzekhwx433 mzekhwx433
  • 10-09-2021
It’s going to take 29 days to lay all the tracks because 174/6=29
Answer Link
am38871
am38871 am38871
  • 10-09-2021

Answer: You have to divide them

Answer Link

Otras preguntas

Which of the following is considered the north star? A. Polaris B. Sirius C. Betelgeuse D. Rigel HELP PLZZZZZZZZZZZZZZZZZZ
Read this passage from Andrew Jackson's message to Congress "On Indian Removal": It gives me pleasure to announce to Congress that the benevolent policy of the
Which athenian building used the golden mean and the pythagorean theorem?
If you answer this correctly, you'll get 90 points plus brainliest. If you comment on the question without answering, I will report you. Five different books (
What title has James Madison been given?
Which statement best described why gene chips are so valuable? Gene chips allowed scientists to evaluate multiple genes at one time; they could even look at an
Which statement can you conclude is true using the given information? 1: AI = KB 2: AI = AK 3: AB = IK 4: AJ = JB
sam evaluated the expression x2y for x = 7 and y = 9. He got a value of 49. which of the follwing statements is correct A. sam's answer is correct B. sam forgo
A mí ____ música las 24 horas del día.
The index number of a combobox object can be assigned to a(n) ____ data type variable