balasupramaniyamraja
balasupramaniyamraja balasupramaniyamraja
  • 09-06-2021
  • Mathematics
contestada

8 man takes 15 days to cut a drain. How many men should be employed to complete the
work?​

Respuesta :

llbedoya
llbedoya llbedoya
  • 09-06-2021

Answer: 8 x 15 = 120

Answer Link

Otras preguntas

The Thompsons have an annual income of $50,000. They budget 9% for savings. They invested 60% of their savings in a one-year CD. The CD earns 11 1/2% annual
What is located in the lateral horn of the spinal cord gray matter?
Which of these processes in the water cycle occurs at a high rate during the formation of thunderstorms? infiltration transpiration condensation runoff
A client is diagnosed with a dysfunctional syncytia. what assessment finding supports this diagnosis?
The team whose primary objective is to prevent the opposing team from scoring is playing -defense -offense -ball control -man-to-man
One of the reasons for the creation of the United States Constitution was to prevent states from conducting trade with foreign nations. Determine if the statem
Which of the following is a mixture? A) sand B) carbon dioxide C) silicon D) silicon dioxide
Anybody know the answer?
if 7 to the second power in parentheses to the X exponent equals 1 what is the value of x
Calculate the mass of oxygen in 350 g of Al(C2H3O2)3 A 57 grams B 164.5 grams C 39.17 grams D 19.58 grams