gaadjskqowjru gaadjskqowjru
  • 08-03-2021
  • Mathematics
contestada

8 men can cut 3 kg of onions in 1 hour 40 minutes then how many people are required to cut the same amount of onions in 40 min​

Respuesta :

samuelonum1
samuelonum1 samuelonum1
  • 13-03-2021

Answer:

3 men approx

Step-by-step explanation:

Given data

8 men can cut 3 kg of onions in 1 hour 40 minutes

let us convert the time to minutes

=1 hour 40min

=60+40

=100 minutes

We are told that

8 men will cut the 3kg onion in 100minutes

Hence x men will cut 3 kg onion in 40 minutes

cross multiply

100x= 40*8

100x=320

divide both sides by 100

x= 320/100

x=3.2men

Hence it will take 3 men approx to cut the onions

Answer Link

Otras preguntas

From the top of a 300-ft lighthouse, the angle of depression to a ship in the ocean is 25°. How far is the ship from the base of the lighthouse?
2 less than the product of 5 and n
Things that cannot be changed in an experiment are dormant called constants called variables not useful
What is santiagos favorite baseball team in the old man and the sea?
Which quadrilateral’s diagonals do not create a 90° angle at its intersection? square rhombus kite parallelogram
explain the meaning of "apace"
In internet terminology, what is the term, .com, called?
Writ the whole number in expanded form 29,780,000
Given the function f(x) = 3^x, find the value of f^−1=(27)
2x + 7y = 8 3x + 2y = -5 Solve algebraically.