3. Explain why the process of project planning is iterative and
why a plan must be continually reviewed during a software
project.
Ans:​

Respuesta :

ghaileflores124
ghaileflores124 ghaileflores124
  • 12-08-2020

Answer:

because they inspecting or checking how there works good or not good there are under there work what a result cause they want a good and beautiful work

Answer Link

Otras preguntas

Fill in the blank with a number to make the expression a perfect square.​
Plz help asap, hehdjjdnejdjfj
Read this excerpt from Ruth Wasem’s response to the government establishing a pathway to citizenship for undocumented immigrants: In 1986, for example, Congress
A rectangular piece of metal is 25in longer than it is wide . Squares with sides 5in long are cut from the four corners and the flaps are folded upward to form
There are 15 m and ms that are peanut or small, 2 m and ms that are peanut and small, and 9 m and ms that are small. How many m and ms are peanut?
Type the correct answer in the box. Use numerals instead of words. If necessary, use / for the fraction bar. The difference of the range and the interquartile r
which temperature is warmer than the freezing point of water A. 0 F B. 0 k C. 1 C D. 33 K
Find the remainder when p(x)= x^5 + x^4 + x^3 + x^2 + 2x + 2 is divided by q(x) = x + 1
How is the solubility of most genes and solids in water affected by the temperature of the water?
What’s the correct answer for this?