s8510187 s8510187
  • 10-02-2020
  • SAT
contestada

In 9 days, a group of workers can plant 27 acres.
What is their rate in acres per day?

Respuesta :

princessbeckii
princessbeckii princessbeckii
  • 10-02-2020

Answer:

3 per day

Explanation:

This is because:

27 / 9 = 3

Answer Link

Otras preguntas

find the rectangular coordinates of the point -3, 1/2 pi​
Describe the role of Endoplasmic reticulum in membrane biogenesis
What can stay constant if there were no forces
Write the ratio: 1.5 to 10 as a fraction in lowest terms.​
Come migajas en distintas manos
In Act 1, Scene 2, Scrooge’s nephew stops by to wish Scrooge a merry Christmas and to invite him to dinner. What do you learn about the two characters from thei
What is the least air quality you can get in the United Arab Emirates
law is a practical discipline; theory has no place in law. with specific references to the law of contract, discuss.​word limit is 750
You're given two side lengths of 6 centimeters and 9 centimeters. Which measurement can you use for the length of the third side to construct a valid triangle?
how do i solve this quadratic problem