jrodriguez245 jrodriguez245
  • 12-12-2019
  • Mathematics
contestada

a construction crew must build 4 miles of road in one week.
on Monday, they build 1/2 miles of road. on Tuesday, they build 1/3 miles of road.
how many more miles of road are left to build

Respuesta :

wdwaddy567
wdwaddy567 wdwaddy567
  • 12-12-2019
3 1/6 because 1/2+1/3 is 5/6 and 4- 5/6 is 3 1/6
Answer Link

Otras preguntas

Are there any personifications in the poem jimmy jet and his TV set?
WHERE DID MOST AMERICANS LIVE IN THE EARLY 1800S
Which requires the removal of heat, melting or freezing?Is it evaporation? What is it? Why?
If the potential energy and the kinetic energy are not the same, where did the leftover energy go?
The major blood vessels include a. arteries. b. veins. c. capillaries. d. all of the above.
Explain why sedimentary rocks are found as a veneer covering large areas of the continental igneous rocks
What happens when two oceanic plates collide
what is 3.36 rounded to the nearest hundreth
A force of 200 N is required to keep an object sliding at a constant speed of 2 m/s across a rough floor. How much power is being expended to maintain this moti
how do you unscramble the science topic atsetlectoicnp