svnnynight
svnnynight svnnynight
  • 07-06-2016
  • Mathematics
contestada

Which one is the correct answer

Which one is the correct answer class=

Respuesta :

apologiabiology
apologiabiology apologiabiology
  • 07-06-2016
jim can do the 1/2 of floor in 4 hours
pete completes 1/2 of floor in 2 hour

therefor, since, pete took 1/2 as much time, pete can tile 2 times as many tiles (logic)

pete can lay 25 more than jim
if pete is 2 times of jim
p=2j
and pete is 25 more than jim
p=25+j
2j=p=25+j
2j=25+j
minus j
j=25

jim lays at 25 tiles per hour
C is answer
Answer Link

Otras preguntas

HELP NOW!Read this line from "Harriet Tubman." Which statement best describes the impact of Greenfield's use of nonstandard English in this line? Didn't come in
What is the square root of m6?
What happened on black Tuesday
Based on your reading of the article “Climate economics in four easy pieces” in the photo copy reader: identify a concept used in this article that we have stu
The Declaration of Independence Quiz Active How did Common Sense influence the Declaration of Independence? by using most of the language and format of the Decl
The given graph represents the function F(x)=2(5)
3. Which number is closest to zero on the number line? A -3/8 B 3/4 C 0.3 D 0.50
Solve the following equations 4x + 3y =17 3x + 2y = 13
Which words contain a root that means “rule”?
Answer please. If you answer, you get 44 points. I don't use the points here. So answer please. I want full work.