jasminejohnsonoz6fvg jasminejohnsonoz6fvg
  • 10-11-2017
  • Mathematics
contestada

A tile company produces 7,500 tiles in 6 days. How many tiles does the company produce in 25 days?


a. 1,800 b.6,250 c. 31,250 d.187,500

Respuesta :

texaschic101
texaschic101 texaschic101
  • 10-11-2017
there r 2 ways u can do this...

(1) find the unit rate...
     7500/6 = 1250 per day
     for 25 days.....1250 * 25 = 31250 tiles <==

or

(2) proportion..
     7500/6 = x / 25.....7500 tiles to 6 days = x tiles to 25 days
     cross multiply
     (6)(x) = (7500)(25)
     6x = 187500
     x = 187500/6
     x = 31250 <==

either way, u should get the same answer
Answer Link
lalaloua
lalaloua lalaloua
  • 10-11-2017
C.31,250
6/7,500=25/x
187,500=6x
x=31,250
Answer Link

Otras preguntas

Write down and simplify the following algebraic expressions. The products of −5 and x+2 is added to −6x−1.
The width of a rectangle is 30% of the length. The perimeter of the rectangle is 338 ft. Find the length and width of the rectangle
2x2-50=0 me ajudem por favor e pra amanha
How should the table be changed to correctly distinguish between mechanical and electromagnetic waves? Earth Earthquake waves and radiation waves need to change
Given the following similar triangles, find x.​
What were the Mayans significantly advanced in?
Boston University was the first to award a woman a doctorate degree. Please select the best answer from the choices provided T F
Many militant Islamists harbor great anger against Americans and other Westerners. Which of the following contributeD to their resentment? will vote brainliest.
The manner in which action is presented indicates verb what?
Can someone please help me