wookiebrewer1467 wookiebrewer1467
  • 06-03-2024
  • Mathematics
contestada

X can do a piece of work in 40 days. He works at it for 8 days and then Y finished it in 16 days. How long will they together take to complete the work?
a) 15 5/15 days
b) 16 2/3 days
c) 17 5/7 days
d) 18 4/9 days

Respuesta :

Otras preguntas

Can Someone help me please :(​
please help. I've been stuck on this for 3 days. I just really need help. ​
What's the total area of a covered box with a length of 4 ft, a width of 3 ft, and a height of 6 ft?
Rewrite this first 3 paragraphs in third person
Write an equation in point-slope form of the line through point J(4, 2) with slope 3
5/9+1/9 in simplest form. Explain.
___ population(s) can have the same species name. 1 2 5 10​
Ed is planning daily walking workouts on the same distance of 12 km in the morning and in the evening. Usually he is walking at constant rate, however he planne
how do you define meridian
Which Quadratic equation is equivalent to (x-4)^2-(x-4)-6=0