fawadazeem9364 fawadazeem9364
  • 06-06-2023
  • Engineering
contestada

After a re-evaluation of the duration of activity B, it has been provided the following data. Most likely duration = 10 Optimistic Duration = 16 Pessimistic Duration = 25 Using the three-point estimating technique the new duration of activity B is a. 7 b. 15 c. 17 d. 22

Respuesta :

Otras preguntas

A softball pitcher pitches a ball at a speed of 74 miles per hour. What conversion factor can be used to find the speed of the ball in feet per second?
what is 3/4 x 2? I tried getting it, but my teacher said it was wrong
how does the food coloring behave?
In the following reaction, how many grams of nitroglycerin C3H5(NO3)3 will decompose to give 120 grams of water? 4C3H5(NO3)3(l) 12CO2(g) + 6N2(g) + 10H2O(g) +
Identify the hypothesis of the statement. If both parents have red hair, then their children have red hair.
Let h(x)=2x+5hand g(x)=8-3xg, What is the value of h(g(1.5)
What happened to Colonel George Custer in 1876?
chilling is most commonly practiced by
Write two expressions that the solution is 19
Write the name of the period that has the digits 913.