Slayboo7957 Slayboo7957
  • 10-11-2022
  • Business
contestada

suppose you evaluated the best-case, most likely, and worst-case duration estimates for an activity and determined that they were 3 days, 4 days, and 8 days, respectively. using pert estimation techniques, what would be the expected duration for the activity? a. 4 days b. 8 days c. 5 days d. 4.5 days

Respuesta :

Otras preguntas

What number equals 3/8?
Compare and contrast the terms scale and scale factor.
What was the popular fashions during the time of Westward Expansion?
What causes wind to deposit sand or other sediment
If the function f(x) represents the number of words that Janet can type in x minutes, what is the possible domain for the function?1) the set of integers2) the
A cooking club has 12 members. How many ways can they select a president and vice president from among the members?   A. 22
how do I solve this?
List in the order the major blood vessels, chambers, and valves through which a drop of blood must pass in traveling from a vena cava
how long can a lightning last
A fruit salad is made from pineapples, pears, and peaches mixed in the ratio of 2 to 3 to 5, respectively, by weight. What fraction of the mixture by weight is